Chepstowe Wind Farm has been in operation since April 2015.

The Chepstowe Wind Farm, located approximately 30 km west of Ballarat, is a three turbine wind farm of 6.15MW capacity. The project was completed in March 2015. The three Senvion turbines began supplying energy to the local grid in April 2015. All the energy produced is be purchased on a long term contract. In an average year, enough renewable energy will be produced to power over 3,400 households.